Energy film · 1:10
From a photo to a live meter, at every site.
How an Augos metering rollout runs: a photo assessment by your own team or electrician, a quote the same business day, the meter shipped ready to fit, and your electrician installing it with live checks and a job card for every site.
The film · 1:10
Checked live. No second visit.
1:10, with captions. Plays in place.
Chapters
Transcript
Three visits, the usual way
Metering a site usually takes three visits from a specialist. One to look, one back to quote, and one more to install. Every visit means traffic, site access, and days of waiting. Augos takes the visits out.
Assess
Assess. Your own team, or the electrician you already use, photographs the board and checks the mobile signal. Nothing a site visit would see is missed.
Quote
Quote. Priced from the photos, the same business day, with the right kit first time.
Ship
Ship. The meter arrives ready to fit.
Install
Install. Your electrician fits it, at their normal rate. The Augos installer app checks the wiring, so there's no second visit. Live in minutes, with a job card for every site.
One standard at every site
Lower cost to deploy. Faster rollouts. No IT network to connect. One standard at every site. From Johannesburg, Cape Town and Durban, to every province, and across our borders. Assess. Quote. Ship. Install. Start your first assessment today, at augos.co.za.