Augos Energy / How we deploy
Metering rollouts for multisite portfolios
From order to live data, site by site.
Each measurement point is assessed from a phone, installed by a qualified electrician with the installer app guiding the job, checked live before activation and recorded on a job card. Live minutes after installation.
Augos is the energy back office for multisite businesses in South Africa: energy management software, bill verification and independent advisers, checking what every site should pay against the meter and the tariff.
The film · 1:10
From a photo to a live meter.
How a rollout runs at every site: assess, quote, ship, install.
Read the transcript
Metering a site usually takes three visits from a specialist. One to look, one back to quote, and one more to install. Every visit means traffic, site access, and days of waiting. Augos takes the visits out.
Assess
Assess. Your own team, or the electrician you already use, photographs the board and checks the mobile signal. Nothing a site visit would see is missed.
Quote
Quote. Priced from the photos, the same business day, with the right kit first time.
Ship
Ship. The meter arrives ready to fit.
Install
Install. Your electrician fits it, at their normal rate. The Augos installer app checks the wiring, so there's no second visit. Live in minutes, with a job card for every site. Lower cost to deploy. Faster rollouts. No IT network to connect. One standard at every site. From Johannesburg, Cape Town and Durban, to every province, and across our borders.
Assess. Quote. Ship. Install. Start your first assessment today, at augos.co.za.
The process
Six steps for every site.
1 · Assess
Self-assessment
A qualified person photographs the point from a phone: breaker, CTs, placement and signal, GPS-pinned. No contractor visit to quote.
2 · Order
Works order and quote
The assessment becomes the works order, the material list and the quote, sized CT included, tied to the site's record.
3 · Install
Guided installation
Your own technician or usual contractor fits the meter, with the installer app guiding each step and a wiring diagram for the connection.
4 · Check
Live checks before activation
Voltage, current, polarity, phase rotation, power factor and signal on the live readings. A blocking check stops activation.
5 · Configure
Over the air
The CT and VT ratios go to the meter over the mobile network. No site visit to change a setting.
6 · Record
Job card
Photos, data checks, notes, time stamp and GPS, emailed on activation and kept for the life of the installation.
The installer app
The electrician's phone does the commissioning.
A free web app, added to the home screen from installer-app.augos.io. It scans the device, sets it up, reads the live data back and will not let a wrongly wired meter go live.




For your electrician
A first Augos install, in four minutes.
The real installer app screens, narrated, with subtitles for watching on site with the sound off. Send it to your electrician before their first job.
Checked before it goes live
A wrongly wired meter cannot activate.
Some wiring faults make every kWh wrong and cannot be corrected afterwards. The app looks for them on the live readings and blocks activation until they clear, with numbered steps to fix them.
- Phase rotation detected. A phase's current is on another phase's voltage. The app names the pair to swap.
- CT reversed on a phase. One CT is facing the wrong way.
- CT wiring fault on a medium-voltage delta connection: a CT reversed, on the wrong phase or open.
- CT and VT ratios confirmed by the meter, so power is not under-reported 60 times on a 6600:110 VT.
The record
A job card for every installation.
Emailed the moment the device activates, and kept for the life of the installation: the reference when a bill is disputed, a meter is moved or a CT is replaced. These are real job cards from real sites, with the photos the electrician took.
| Measurement point | Main incomer, plastics factory |
| Started · completed | 16:15 · 16:23 |
| Connection · CT ratio | LV star · 800:5 |
| Cellular signal | 31 · Good/Excellent |
| Frequency | 49.87 Hz |
| Checks | All pass |
| Photos | 6 of 6 |
| Live reading | Phase A | Phase B | Phase C |
|---|---|---|---|
| Voltage | 231.53 V | 232.27 V | 231.33 V |
| Current | 18.02 A | 36.29 A | 16.82 A |
| Power | 3.672 kW | 8.358 kW | 3.826 kW |
| Power factor | 0.88 | 0.99 | 0.98 |




Augos installer app, job card of a real installation at a live site, 16 Oct 2026
| Measurement point | Transformer mains, industrial site |
| Started · completed | 09:14 · 09:21 |
| Connection · CT ratio | LV star · 1600:5 |
| Cellular signal | 25 · Good/Excellent |
| Frequency | 50.14 Hz |
| Checks | All pass · low power factor flagged on phases B and C |
| Photos | 6 of 6 |
| Live reading | Phase A | Phase B | Phase C |
|---|---|---|---|
| Voltage | 229.83 V | 228.70 V | 229.87 V |
| Current | 55.14 A | 54.32 A | 55.10 A |
| Power | 9.295 kW | 6.570 kW | 7.623 kW |
| Power factor | 0.73 | 0.53 | 0.60 |




Augos installer app, job card of a real installation at a live site, 17 Oct 2026
Water, the same way.
An Augos Pulse reads a water meter's pulse output. Before handover the app checks that the pulse constant matches on the meter and the device, and that the device reports the dial reading back.
| Measurement point | Municipal water meter, office campus |
| Started · completed | 12:24 · 12:58 |
| Pulse constant, meter · device | 100 L/pulse · 100 L/pulse |
| Dial reading · device total | 623.0 kL · 623.3 kL |
| Battery | 3.60 V, healthy |
| Signal | -77 dBm, good |
| Checks | Transmission verified on site |
| Photos | 5 of 5 |




Augos installer app, job card of a real Augos Pulse installation at a live site, 13 Oct 2026
Who does what
Local installers, one standard.
Your electrician
A qualified electrician: your own technician or the contractor you already use. Responsible for the wiring and workmanship, paid at their contracted rate.
Augos
Responsible for the hardware. The energy desk is on the phone in office hours and reviews every installation's photos and data afterwards.
The app
Guides the job, checks the live readings, blocks what cannot be fixed later, and writes the record. The same standard at every site.
Free site assessment
Assess your measurement point and get a quote.
Tell us the site type, supply size and number of sites, photograph the measurement point, and we quote. Electricity now; water, gas and fuel next.
What it costs
One price per meter.
R450 a month per meter, ex VAT, covers every module. Installation is by your electrician, at their contracted rate.
Questions
Who installs the meters?
A qualified electrician: your own on-site technician or the contractor you already use for electrical work. The Augos installer app guides the job, so no specialist Augos technician needs to travel to site.
Who is responsible for what?
Augos is responsible for the hardware. The installer is responsible for the wiring and workmanship, and is paid by you at their normal rate.
How do you know an installation is right?
The installer app checks the meter's live readings before activation: voltage, current, polarity, phase rotation, power factor, frequency and signal. Faults that would make every reading wrong block activation until they are fixed, and the app shows the steps.
What does the electrician need before going to site?
The installer app on the phone's home screen (installer-app.augos.io, in Safari or Chrome), the CT ratio from the CT label, mobile signal at the board, and the site's own isolation and permit rules. The four-minute guide on this page covers the rest.
What record do we get?
A job card for every installation, emailed on activation: photos, the data checks, notes, a time stamp and GPS co-ordinates, kept on record for when the installation changes later.
How soon is a site live?
Minutes after installation. The meter is identified, checked and activated in the same visit.
Can we roll out across many sites and countries?
Yes. Every device lands on the same platform and the same measurement hierarchy, wherever it is installed.