Energy film · 1:32
Every part of your correction tested, and recorded.
What happens in an Augos power factor survey: the bill and the consultation, isolation and safety, the capacitor, fuse, contactor, reactor and controller checks, dust and heat marks, back in service, the health report, and monitoring between surveys.
The film · 1:32
Every part tested. Every part recorded.
1:32, with captions. Plays in place.
Chapters
Transcript
The bill
Every power factor survey starts with the numbers, not the panel. First we read your bill. If you pay for demand in kVA, poor power factor is costing you every month.
The consultation
Then we ask how many correction panels you have and their voltage, and we quote the survey.
Safety first
On site, safety comes first. The panel is isolated and locked off, the capacitors are left to discharge, and it is tested dead before anyone touches it.
Capacitors
Every capacitor is tested for lost capacitance, and checked for bulging, venting and leaks.
Fuses
Every fuse is checked for continuity and the right rating. A blown fuse takes a stage offline, and the meter cannot tell you why.
Contactors and reactors
Contactors are checked for worn, pitted or welded contacts. Reactors are checked for heat damage.
The controller
The controller is set to match today's load, not the load it was installed for. Protection limits are confirmed.
Dust and heat marks
Dust and heat marks are noted in the record. Cleaning is done with the repairs, after the survey.
Back in service
Back in service, the stages step in. The Augos meter shows power factor every minute, so we see the correction working.
The health report
You get a written health report: every part, what we found, and a costed fix. Repairs are quoted separately, and only if the survey finds a cause.
Between surveys
Between surveys, Augos keeps watch. If power factor slips, you hear about it that day, not at month end. Book your power factor survey at augos.co.za.