Augos Factory / Industries / Food, beverage and milling

Filling, bottling, baking and milling lines

The allocated time is 170 minutes. Your line's record says 134.

Cleaning, flavour and pack changes, waits for syrup, preforms or flour, and hundreds of interruptions (short stops) a day. Augos Factory times each one against its allocated time and your own best.

From R4,950 per line per month, ex VAT

Each ring runs to three hours. Recommended is the median less the median absolute deviation, from 82 cycles.
Augos platform, Planned Stoppage Analysis · one anonymised beverage line · four months in 2026 · site, products and people removed.

97.8 hwaiting for raw material on one beverage line in one monthMeasured
13,260interruptions on the same line, the same monthMeasured
13 of 24CIP cycles in one month ran over the 170-minute allocated timeMeasured
R4,950per line per month, ex VAT

Where food and beverage lines lose time

Four losses this industry knows well.

Cleaning and CIP

Each cycle timed against its allocated time and the line's recommended time.

Flavour and pack changes

Every changeover split into its allocated time and its overrun, per changeover reason.

Waits for material

Syrup, preforms, labels, flour: recorded as their own loss, with their root in the reason tree.

Interruptions

Jams and blocked infeeds under the threshold, counted by the sensor without an operator code.

One month on one beverage line

Three losses, three different fixes.

Breakdowns sit with the technicians who took the calls, from the call to the restart. Waits for material sit with the operators logged in, and the reason tree shows whether the material was on site or had not arrived. Interruptions are an account of their own, traced to the operator and product.

One line · one month

Measured

251.6 h to win backfrom 720 paid hours, by who can win them back, biggest first

The other 468.4 paid hours are not itemised here.

Breakdowns

99.2 h

13.78% of paid time · 417 events

→ The technicians who took the calls

Raw-material waits

97.8 h

13.58% of paid time

→ The operators logged in; the reason tree shows supply

Interruptions

54.6 h

7.58% of paid time · 13,260 events

→ Their own account, traced to operator and product

Augos platform, Production Timesheet · one anonymised beverage line · one month in 2026 · site, products and people removed.

What the CIP overruns could be worth

Estimate what the time past the line's own best is worth.

The hours are measured. The rand figure is your own estimate: pick a value close to what an hour of net production earns your line.

An hour of net production, as examples. How to estimate it ›

CIP time above the recommended time, your own estimate

Hours measured · example value

R30,420

16.9 hours above the recommended 134 minutes over 24 cycles in one month, your own estimate at an example R1,800 an hour of net production

Above recommended · 16.9 h
R30,420
Above the 170-min allocated time · 7.6 h
R13,680

Augos platform, Planned Stoppage Analysis · one anonymised beverage line · one month in 2026. The platform shows the hours; the rand figure is your own estimate at an example value. Time already spent is a measure of the gap, not money in the bank.

Where to start

Three losses, three different jobs.

1 · Cleaning

Repeat the line's own best

The line's recommended CIP time is 134 minutes, against a 170-minute allocated time. Setting the allocated time is planning's call. Keeping to it is the line's.

Who acts: planning, then the line team

2 · Material waits

Find where the material was

97.8 hours in one month. On site but not at the line is production's to recover. Not yet delivered is supply's.

Who acts: production or supply

3 · Interruptions

Count what no one logs

13,260 stops under the threshold in one month, 54.6 hours. The sensor times them without an operator code.

Who acts: the line team, with maintenance

The Augos Operator Terminal's job screen: the product, job reference, OEE and rings for availability, performance and quality, with the shift's stops listed on the left, including a CIP

Built for the floor

Made for a wash-down floor.

The Augos Operator Terminal sits in a sealed stainless-steel enclosure beside the operator. The count sensor mounts outside the product zone.

304food-grade stainless-steel enclosure
IP65sealed terminal enclosure, by design
−20 to +50 °Coperating range, 5 to 95% humidity, non-condensing
IP69Kcount sensor available for wash-down areas

Recreated screen of the Augos Operator Terminal on demo data.

Resource intensity, an optional extra

What an idle line still draws.

Measured64.5 kWh/twhile producing, on one metered line
Measured351 kWhdrawn in each idle half hour
Measured42.8 kWhfor each extra tonne made

Augos platform, energy per unit · one anonymised metered line · one period in 2026 · site, products and people removed. Resource intensity ›

Questions

Food and beverage, answered.

Does the kit meet food-safety and hygiene requirements?

The terminal sits in a sealed, food-grade 304 stainless-steel enclosure designed to IP65, for −20 °C to +50 °C and 5 to 95% humidity, non-condensing. The count sensor is chosen for the area, up to IP69K for wash-down, and mounts outside the product zone.

Do we have to connect to our PLCs?

No. One sensor on the bottleneck sees every stop. Nothing is read from your PLC or SCADA.

Can we track CIP separately from changeovers?

Yes. Each is its own planned stop with its own allocated time, so overruns show separately.

Our packhouse runs in seasons. Do we pay all year?

No. Fruit packhouses, wineries and other seasonal plants can pause a line between seasons for R350 per month, ex VAT. The sensor and terminal stay mounted and the record carries over. Each line runs at least three months a year at the full R4,950. Pricing ›

Do you work with milling and baking as well as beverages?

Yes. Augos measures flour mills and bakery lines as well as beverage lines. Any line with a bottleneck a sensor can see fits.

See every CIP and changeover against your own best.

Thirty minutes with a manufacturing specialist who knows filling, baking and milling lines.

  • Cleaning, changeovers, waits and interruptions, side by side
  • A rand value on each
  • Prices in rand, ex VAT

A manufacturing specialist replies within two business hours to set a 30-minute call.