Augos Factory · Food and beverage

OEE for food and beverage plants, with an owner on every minute.

Food and beverage lines lose time in three places a standard OEE report blends together: changeovers and clean-in-place, hundreds of short stops on fillers and packers, and waiting for material. Augos Factory measures each against the line's own standard and its own best shift, and puts every lost minute on the function that can recover it.

Beverage line · one month, 2026720 paid hours
41.5%
of paid time spent producing
  • Unplanned stops534 events · planning, technician, operator230.2 h
  • Planned stops133 events · planning and operator108.8 h
  • Interruptions13,260 events · operator54.6 h
  • Speed and quality lossspeed 23.2 h · quality 4.2 h27.4 h
Augos platform, Performance Overview and Unplanned Stoppage analysis. One anonymised beverage packaging line, one 30-day month in 2026. Site, products and people removed.
13,260Interruptions in one month, about fifteen seconds each
54.6 hlost to them, 7.6% of paid time
69.7 hgap to the line's own best operator
7 daysfrom go-ahead to measuring

Food and beverage lines fail in patterns.

Short runs, strict hygiene and perishable inputs give these plants a loss profile of their own. Each pattern has a measurement that names its owner.

13 of 24CIP cycles over standard · 7.6 hours

Changeovers and clean-in-place, timed against standard.

Every CIP cycle, hot rinse, changeover and quality check is declared on the terminal and timed against its Standard Allowed Time. The 170-minute CIP standard was missed on 13 of 24 cycles, while a 2-minute quality-check standard was missed on 27 of 39. The first is coaching; the second is a standard that needs re-planning.

7.6%of paid time · one every minute and a half

The interruptions nobody logs.

A jam that clears itself, a sensor that trips and resets, a hesitation at the transfer. The Augos Operator Terminal counts every pulse and times the gap between them in milliseconds, so it catches every one. They made a fast machine look like a slow one.

97.8 hfive raw-material waits · one month

Waiting for material.

Waiting for raw material stopped the line five times and cost 97.8 hours. No technician can shorten that. The Owner column puts it on planning and the supplier, so the morning meeting argues about the right thing.

69.7 hgap to the line's own best · 9.7 points

The gap to your own best shift.

One recurring fault at a single station stopped the line dozens of times. The line's typical clearance was 6.1 minutes; the best graded operator cleared it in 5.5. The Best Operator Benchmark builds the line's best plausible day from times colleagues have already achieved.

Augos platform, one anonymised beverage packaging line, one month in 2026. Full tables: Planning Efficiency Loss and Operator Compliance, Stoppage analysis, Best Operator Benchmark (Factory knowledge base).

See your own line's month. A 30-minute call with a manufacturing specialist, using one of your lines as the example.

Standard OEE shows the loss. OEE+ shows who owns it.

The arithmetic of OEE stays exactly as you know it. One column is added, and the fix follows the owner.

  • The Owner column: operator, technician, planning, quality, external and shared. How it works
  • Planned stops: the schedule's share is Planning Efficiency Loss, the execution's share is Operator Compliance, reported apart. The two losses
  • Food-grade hardware, no PLC: a brushed 304 stainless steel, IP65 Augos Operator Terminal and an IP67 pulse sensor at the bottleneck. The terminal
  • Augos Assist (Response): splits a filler fault into operator evaluation and resolution, technician response time, and active and inactive wrench time. Augos Assist
Pricing

What it costs, and what you get.

One offer covers every line. The monthly fee includes every capability except the metrics that need Augos Assist, an optional extra.

Augos Factory · standard plan
R4,950per line, per month, ex VAT

R19,500 once per line for deployment, ex VAT.

Several lines? The price per line falls. We agree it with you in conversation.

Book a demo

The first 90 days cannot be cancelled. After that, one calendar month's notice, and the hardware comes back to Augos.

The monthly fee includes

  • Every capability, except the metrics that need Augos Assist
  • The Augos Operator Terminal and pulse sensor, owned by Augos
  • A SIM supplied by Augos, so there is no network or IT project
  • A free terminal replacement every 36 months, and a one-year warranty

The once-off fee covers

  • Set-up and remote testing
  • Two days of on-site operator training
  • Four weekly one-hour data reviews
  • Leadership training on the platform

Travel and subsistence for on-site training are not included.

What you provide

A power point at the line. Your own people mount and connect the terminal, with our guidance.

Optional extras, per month, ex VAT

  • Augos Assist: R250 per technician, or R1,250 for the whole site
  • Public Display: R300 per display, or R1,500 for the whole site

See every capability and what Augos Assist adds

Food and beverage lines on Augos.

Anonymised. Every figure traces back to the platform.

All Factory case studies

Energy and water per unit made: resource intensity reads the site meter against the production count, half hour by half hour.

Common questions.

Is our OEE low because of the plant or the people?

Usually both, in measurable proportions. On one anonymised beverage packaging line, over one month in 2026, five raw-material waits were 97.8 hours, 43% of unplanned time (a planning and supplier question) and 417 breakdowns were another 43% (a technician and operator question). The Owner column shows the split; a single OEE figure cannot.

How do you measure clean-in-place and changeovers fairly?

Each planned task has a Standard Allowed Time. The scheduled time is Planning Efficiency Loss, owned by planning. Time over the standard is Operator Compliance loss, owned by the operator. Time under the standard is a Capacity Opportunity, which says the standard can be tightened. The three are reported apart.

Do you need to connect to our fillers' PLCs?

No. A sealed pulse sensor counts product at the bottleneck and the Augos Operator Terminal captures stops and reasons, so the system works on any line, old or new, with nothing wired into your controls.

Is the hardware suitable for a washdown environment?

The Augos Operator Terminal is a brushed 304 food-grade stainless steel unit rated IP65 against dust and water; the pulse sensor is sealed to IP67.

Can we see energy and water per unit of production?

Augos Energy meters electricity, water, gas, fuel and compressed air at the same sites, so resource use can be read against production per half hour. A measured figure per unit is what a customer's carbon questionnaire asks a supplier for.

Book a demo

See the gap to your own best shift, on one filler, packer or bottling line.

A 30-minute call with a manufacturing specialist. We look at one of your lines together and show you where the month's hours went, and who can get them back.

  • Live within 48 hours of your kit arriving
  • One sensor, one terminal, no PLC and nothing to integrate
  • R4,950 per line per month, ex VAT. 90 days, then a month's notice
What happens nextA manufacturing specialist replies within two business hours to set a 30-minute call. We start with your objectives, so the demo answers your exact need and we can say honestly whether we can meet your expectations. Then we show you the parts of the platform that bear on those objectives, on demo data, so you can judge the fit for yourself. If it fits, a full evaluation of your line follows.
Start with your details

Step 1 of 3. Next: your line and a time that suits you. No lead is created until you confirm on the last step.

Step 1 of 3 · Your details