TPM and the six big losses, measured without clipboards.

In short

Total productive maintenance (TPM) makes equipment reliability everyone's job, not only maintenance's. It tracks six big losses: breakdowns, set-ups and adjustments, small stops, reduced speed, start-up rejects and production rejects. Together they explain the gap between a line's OEE and 100%.

6 losses
behind every OEE score
99.2 h
of breakdowns on one beverage line in one month
Measured
8 pillars
of a full TPM programme
R4,950
per line per month to measure all six, ex VAT

The six big losses

What are the six big losses in TPM?

LossOEE factorExampleHow it is measured automatically
BreakdownsAvailabilityA motor trips and the line standsStop timed by the sensor; reason given at the line
Set-ups and adjustmentsAvailabilityA product changeoverPlanned stop: the standard and the overrun, separately
Small stopsPerformanceA jam cleared in forty secondsCounted and timed by the sensor, however short
Reduced speedPerformanceRunning below rated speed to avoid jamsTrue speed, measured only while the line is in motion, against your rated speed; reported apart from small stops
Start-up rejectsQualityScrap while a line settles after a changeoverRejects entered at the Augos Operator Terminal against the job
Production rejectsQualitySteady-state scrap and reworkRejects entered at the Augos Operator Terminal against the job

The losses around the line

The paid hours the six losses leave out

The six big losses are measured inside planned production time. The paid hours around it, breaks, cleaning, waiting for material and idle lines, sit outside. On the lines Augos measures, some of the largest losses sit there. They sit with planning and the operators as much as with the technicians.

One month, 720.0 paid hours

Measured
Raw-material waits
97.8 h
Breakdowns · 417 events
99.2 h
Interruptions (short stops) · 13,260 events
54.6 h
Rest of paid time, not itemised here
468.4 h

Augos platform, Production Timesheet · one anonymised beverage line · one month in 2026 · site, products and people removed.

The programme

The eight pillars of TPM

Autonomous maintenance

Operators clean, inspect and lubricate their own equipment.

Planned maintenance

Maintenance scheduled from failure history, not the calendar alone.

Focused improvement

Small teams attack one loss at a time.

Quality maintenance

Conditions that cause defects are found and held.

Early equipment management

Lessons from today's lines built into new ones.

Training and education

Skills for operators and artisans to run the other pillars.

Safety, health and environment

Zero accidents as a condition of the rest.

TPM in administration

Planning, stores and procurement losses removed too.

Run TPM on the record

Six losses, each with an owner

TPM starts by measuring the six losses on one line for a month. Here is that month, read from the time account, with who each loss sits with.

Pick a loss to see where it is measured and who owns it. Breakdowns open into the Assist stages: evaluation, response and the two wrench times.

Focused improvement then works on the largest loss with a single owner. The same month as a flow ›

Time account · one line · one month · 730h 54m paid

Illustrative

Augos category

Unplanned stops

Owner

Operator 79h 58m · Technician 82h 53m

Read from

Unplanned Stoppage Analysis, with the Assist stages

The operator resolved or evaluated the stop; the technician owns response, active wrench and inactive wrench time.

The six losses come to 377h 23m of 730h 54m paid. Net production is the other 353h 31m.

Illustrative data, not a customer. The same month as the time account on the OEE and method pages. Operator Evaluation, Technician Response and the two wrench times need Augos Assist.

In the toolbox

Where to start

One line, six losses, one month

Most TPM programmes start by measuring the six losses on one line for a month. Done by hand, that is a clipboard at every stop. With a count sensor and an Augos Operator Terminal, the six losses and the paid hours around them are measured every shift. Each lost minute sits with the person who can win it back, by the part of the stop it falls in.

How Augos Factory works ›

Questions

TPM, answered

Is TPM the same as preventive maintenance?

No. Preventive maintenance is one part of TPM's planned maintenance pillar. TPM also covers operators' own care of equipment, improvement teams, quality and training.

Which of the six losses is usually biggest?

It depends on the line. Small stops and reduced speed are the most often underestimated, because they rarely appear in manual logs.

How do we measure small stops?

With a sensor that times every stop, however short. A clipboard can't keep up with stops of forty seconds.

See TPM on your line.

Start with one shift's numbers in the calculator, or see a month on a line like yours in a demo.