Plant methods, worked on real South African lines.
Plain guides to OEE, kaizen, root cause analysis, TPM, maintenance and changeovers. Each has a worked example from measured data, a calculator or template you can use today, and the limits of the method.
Method guides
Start with the question you have
OEE
How do I calculate OEE?
The formula, the three factors, a worked example and what the score hides.
Recoverable time
How much time can we win back?
The minutes above a target the line has already reached, summed. Measured, not a forecast.
Kaizen
How do I run kaizen on facts?
Pick the loss, measure it, change one thing, measure again.
Root cause analysis
How do I find the root cause?
Five whys and Pareto on timestamped stops, not memory.
TPM
What is total productive maintenance?
The pillars, the six big losses and where to start.
Maintenance
Preventive or predictive?
What each needs, and which failures each one prevents.
MTTR and MTBF
How do I measure repair time?
Response and repair, split, so each can be improved.
SMED
How do I cut changeover time?
Five steps, with your own fastest changeover as the target.
Variation
Why does the same task vary?
Standard work, Six Sigma, and variation between teams and sites.
Operators
Who should train whom?
The best operator sets the benchmark. Trainees are measured against it, task by task.
Tools
Use them today
OEE calculator
OEE from your own numbers, and what an hour of net production could be worth, from your own sales value.
Try the calculator ›
Downtime tracking template (Excel)
The stop reasons and fields we use, ready to fill in on paper or in Excel.
Download the template (Excel) ›
Glossary
Every term in plain English, beside the name you will see on screen.
Open the glossary ›
Reading
Articles and the buyer's guide
Articles
Findings from measured South African lines: the Interruption Whitepaper, the fragmentation gap and the thresholds that hide real losses.
Read the articles ›
OEE software buyer's guide
Eight questions to ask any OEE software vendor, us included. What to ask for in every quote, and when Augos Factory is the wrong choice for you.
Read the buyer's guide ›
Research
Interruptions on South African lines
A study of measured stop data from South African production lines. It shows how much paid time interruptions take, how the stop threshold changes what you see, and what the data does not show. The method and its limits are published with it.
Interruptions as a share of paid time, by line
MeasuredAugos platform, Production Timesheet · 50 anonymised South African lines with complete line-level data · September to November 2025 · site, products and people removed.
Product guides
Already on Augos? The guides are in the KB.
How-to articles for each report, written with the report's on-screen name, so what you read matches what you see.
For students and lecturers
Real stop data for real coursework
Worked problems built on real stop records, and guest lectures, for industrial engineering and operations courses.
See these methods on your own line.
Thirty minutes with a manufacturing specialist, on one of your lines.
- Every stop timed, with its reason
- Losses in hours, with your own rand estimate
- Prices in rand, ex VAT
A manufacturing specialist replies within two business hours to set a 30-minute call.