Augos Factory / Learn

Learn · methods, tools and research

Plant methods, worked on real South African lines.

Plain guides to OEE, kaizen, root cause analysis, TPM, maintenance and changeovers. Each has a worked example from measured data, a calculator or template you can use today, and the limits of the method.

13,260
interruptions (short stops) on one line in one month, the kind these guides teach you to find
Measured
10 guides
each with a worked example and its limits
Free
calculator and Excel templates
R4,950
per line per month to measure it all, ex VAT

Research

Interruptions on South African lines

A study of measured stop data from South African production lines. It shows how much paid time interruptions take, how the stop threshold changes what you see, and what the data does not show. The method and its limits are published with it.

Read the research ›

Interruptions as a share of paid time, by line

Measured
0% 10% 20% 30% 40% Line 1 of 50: 0.0% of paid time Line 2 of 50: 0.0% of paid time Line 3 of 50: 0.0% of paid time Line 4 of 50: 0.0% of paid time Line 5 of 50: 0.0% of paid time Line 6 of 50: 0.2% of paid time Line 7 of 50: 0.5% of paid time Line 8 of 50: 0.8% of paid time Line 9 of 50: 1.4% of paid time Line 10 of 50: 2.6% of paid time Line 11 of 50: 2.7% of paid time Line 12 of 50: 3.2% of paid time Line 13 of 50: 3.6% of paid time Line 14 of 50: 3.6% of paid time Line 15 of 50: 4.5% of paid time Line 16 of 50: 5.5% of paid time Line 17 of 50: 6.0% of paid time Line 18 of 50: 6.0% of paid time Line 19 of 50: 6.4% of paid time Line 20 of 50: 7.2% of paid time Line 21 of 50: 7.4% of paid time Line 22 of 50: 7.4% of paid time Line 23 of 50: 7.6% of paid time Line 24 of 50: 8.5% of paid time Line 25 of 50: 8.6% of paid time Line 26 of 50: 9.2% of paid time Line 27 of 50: 9.8% of paid time Line 28 of 50: 9.9% of paid time Line 29 of 50: 10.3% of paid time Line 30 of 50: 10.4% of paid time Line 31 of 50: 12.8% of paid time Line 32 of 50: 13.1% of paid time Line 33 of 50: 13.9% of paid time Line 34 of 50: 13.9% of paid time Line 35 of 50: 14.2% of paid time Line 36 of 50: 14.7% of paid time Line 37 of 50: 16.2% of paid time Line 38 of 50: 17.2% of paid time Line 39 of 50: 17.7% of paid time Line 40 of 50: 18.4% of paid time Line 41 of 50: 18.6% of paid time Line 42 of 50: 20.1% of paid time Line 43 of 50: 20.8% of paid time Line 44 of 50: 23.2% of paid time Line 45 of 50: 23.2% of paid time Line 46 of 50: 23.8% of paid time Line 47 of 50: 27.6% of paid time Line 48 of 50: 29.2% of paid time Line 49 of 50: 32.3% of paid time Line 50 of 50: 40.8% of paid time 10% OF PAID TIME MEDIAN LINE 9% 22 OF 50 LINES AT 10% OR MORE 50 LINES, LOWEST TO HIGHEST SHORT STOPS AS A SHARE OF PAID TIME · POOLED 10.1%

Augos platform, Production Timesheet · 50 anonymised South African lines with complete line-level data · September to November 2025 · site, products and people removed.

Product guides

Already on Augos? The guides are in the KB.

How-to articles for each report, written with the report's on-screen name, so what you read matches what you see.

Open the knowledge base ›

For students and lecturers

Real stop data for real coursework

Worked problems built on real stop records, and guest lectures, for industrial engineering and operations courses.

For students and lecturers ›

See these methods on your own line.

Thirty minutes with a manufacturing specialist, on one of your lines.

  • Every stop timed, with its reason
  • Losses in hours, with your own rand estimate
  • Prices in rand, ex VAT

A manufacturing specialist replies within two business hours to set a 30-minute call.